The problem
To plan a process, you need a short-term forecast of what it will produce. The thorough way to
get one is to build a physics-based simulation, which takes months and a budget to match. The
capstone asked whether the operating data that gets measured routinely could give a usable
forecast far faster.
The system has inputs an operator can control and outputs that get measured. When the operator
changes a setting, the output responds, and the relationship is stable enough to learn from.
That input-to-output shape is the general case, so the method carries over to a production
line, a utility or a pipeline, whatever industry the data came from.
Conceptual illustration. Not the project's data.
The structure that makes the method transfer: settings you control, a process, measurements that come back.
The data
Equinor's Volve open dataset:
several producing units and two injectors, with rates, pressures, control settings and hours
on stream. The analysis went deep on one unit.
Cleaning came before any model ran. Hours-on-stream values above the maximum possible were
treated as outliers. The rates turned out to be log-normally distributed, not normal, and that
changes what a residual plot is telling you.
How we approached it
Four families of model, compared on the same data:
Multiple linear regression, with predictors checked for significance and multicollinearity
A univariate ARIMA on the differenced series
A transfer-function model: each input pre-whitened, lags identified, then fitted
A multivariate VARMAX, with around fifty specifications tested and selected on an
information criterion
Running all four side by side showed how differently models that describe the same history can
behave once they have to predict.
How it is built
This was a study, with no production system behind it. Each model was prepared and fitted the
same way, then asked to forecast a stretch of data it had not seen. The test that mattered was
whether a forecast stayed inside what the process can physically do.
Methods and tools: SAS, JMP, Python and Tableau, which were
the tools available at the time.
What we can show
The model with the best in-sample fit produced the least realistic forecast.
The ARIMA fitted the history better than anything else and then predicted a future the process
could not physically produce. Selecting on fit statistics alone would have chosen it.
The transfer-function model fitted slightly worse and forecast sensibly, because it encoded
what drives the output: when a control setting is turned down, the forecast follows it down.
The multivariate model was quick to build and captured how the outputs move together.
Fit on the historyForecast behavior
Linear regressionFit on the history A reasonable baseline once the predictors were checked Forecast behavior Useful as a reference point, not as a forecast
ARIMAFit on the history The closest fit of the four Forecast behavior Left the range the process could physically produce
Transfer functionFit on the history Slightly looser Forecast behavior Followed the history, and responded correctly when a control setting changed
Multivariate (VARMAX)Fit on the history Quick to build, residuals well behaved Forecast behavior Captured how the outputs move together, then drifted on the longer stretch
The result changes with the variable
For the main rate, the transfer-function forecast stayed close to the held-back validation
data while the multivariate model drifted well above it. For the second variable the picture
reverses later in the comparison: the multivariate model stays closer, and the
transfer-function line climbs away from the data.
So this entry doesn't name a winning model. The useful lesson is to test on the variable you
care about, because an average across outputs would have hidden the reversal completely.
What this page leaves out on purpose
You won't find an accuracy figure, an error percentage or a claim about how far ahead any of
these models can be trusted. The original outputs were produced in software we no longer
license, so nothing can be re-opened and checked against its source. Publishing a number we
can't verify would be worse than publishing none, and the finding above doesn't depend on one.
The original presentation also estimated time and cost savings against building a simulation.
Those were a student's projections, never measured outcomes, so they're left out too.
What it demonstrates
Fit statistics don't tell you whether a forecast is good enough to decide with. The test is
whether it behaves correctly when someone changes a setting, and whether it holds up on the
variable the decision depends on.
That's the test we apply to a forecast now. It's also why the
forecasting package reports performance on data the model
never saw, and not on the history it was fitted to.
What we would do differently today
We'd rebuild it in open Python, as a reproducible notebook anyone can run. Rolling-origin
validation would report the error for each horizon separately, and a machine-learning baseline
would sit alongside. That's the only route to numbers a reader could check. We've written it
down as a project, which is not the same as a promise.